Here you see the deck from the page “Project Gallery: Deck” in various stage of its construction.

deck building 001

Demolition of the old garage using the old block as clean fill.

deck building 002

Excavation in the back yard for new French drain.

deck building 003

Clean fill was used to build a temporary ramp into the back yard to excavate for the French Drain.

deck building 004

Gravel is bagged up to the drain excavation using a Bobcat.

deck building 005

Drain pipe is buried under the deck site and the land is graded for construction.

deck building 007

Now that the land is graded and a retaining wall is completed work can begin on the deck.

deck building 008

Post and joists are put in place.

Idea Logo bulbs

This web page was created by Paul C. Stauffer III, graphic artist and media designer. For information about media and design services please visit www.ideamover.net  Paul C. Stauffer III is not responsible for the content on these web pages. All content responsibility lies with the client who commissioned the creation of the web page content.